Check a Dholera land deal before you pay for it.

Twenty six tools that do the arithmetic and the paperwork checks a seller will not do for you: what a plot really costs once stamp duty is added, what a registration number means, what the government actually charges to stamp and register a document, who the company selling to you is, and what is genuinely built on the ground.

Dholera SIR stands for Special Investment Region, the government-planned industrial area about 100 km southwest of Ahmedabad. No figure on this site is invented, and every number carries its source and its date.

Open the tools See what is built

PLAN SHEET 03 / DHOLERA SIR 22.24° N · 72.19° E N FP 112 FP 113 FP 115 FP 114 ACTIVATION AREA · 22.5 SQ KM RWY 3,200 M NH-751 · 109 KM · OPEN 0 TO 3 KM
109 km
Expressway from Ahmedabad, reported inaugurated 31 Mar 2026 Open
80%
How complete the airport was reported to be in Jul 2026 Reported
Rs 91,000 cr
Tata semiconductor plant, under construction Durable
300 MW
Solar commissioned out of a 1,000 MW first phase Durable

Why this site exists

Almost every Dholera website is run by someone with a plot to sell.

Developers, brokers and the agencies they hire publish nearly everything you can read about Dholera. That is why airport opening dates contradict each other from one site to the next, and why price claims stretch to fit whatever is being sold that week. A site with nothing to sell has no reason to bend a number.

So three rules apply to every page here. No invented or adjusted data. No opinion, flattering or otherwise, about any named developer. No superlatives. Where the honest answer is that nobody knows yet, the page says nobody knows yet.

What the label after each number means

Every figure on this site carries one of these three, so you can tell a settled fact from a press report from a promise.

  • DurableA settled fact from a government or primary source. For example, the region covers a planned area of about 920 sq km.
  • ReportedPublished by credible press or by the company itself, but not independently confirmed. Always carried with the date it was reported.
  • TargetA stated goal or deadline, not a status. Dholera has a long record of these moving, so a target is never written here as though it has already happened.

Work out a government fee

What the state and the authority actually charge.

Every rate on these pages was read off a government document, with the printed page number recorded. Where a document does not settle a figure, the calculator returns UNKNOWN instead of guessing.

Straight answers

The four questions people ask most

Is it safe to buy land in Dholera?

It can be, if the plot sits inside the SIR and the project holds a live GUJRERA registration, non-agricultural status and a clear title. GUJRERA is the Gujarat property regulator that qualifying projects must register with, and non-agricultural status is the permission that makes building on farmland legal. The documented risk is farmland well outside the Activation Area, the roughly 22.5 sq km first phase, being marketed as though it were inside it. The verify tool walks you through the exact checks.

What is the current status of Dholera in 2026?

The Ahmedabad to Dholera expressway was reported inaugurated on 31 March 2026. The airport was reported around 80 percent complete in July 2026, with operations targeted for late 2026. The Tata semiconductor plant of Rs 91,000 crore is under construction. Around 300 MW of solar is commissioned. The tracker page carries the dated detail for each of these.

Who runs this site and what does it sell?

It is an independent reference and it sells nothing. No plots are listed, no enquiries are passed on to anyone, and there is no connection to DSIRDA, DICDL or any developer. Every number is labelled with where it came from and when. Where a figure cannot be confirmed, the page says so rather than quoting one anyway.

Where do the numbers come from?

Government and primary sources first: dholera.gujarat.gov.in, PIB press releases, NICDC reports, Central Electricity Authority data for solar, and GUJRERA. Broker figures appear only where no official number exists, and they are always labelled as quotes rather than facts.